I know of a few people in Pretoria who's power sometimes don't go off when it is supposed to. Seems Tshwane doesn't really have things under control at times - or maybe usage is so low that some suburbs get spared at times. I didn't think I would ever say this but I am missing stage 2 loadshedding! My recordings are really suffering!

 

It also didn't help that I returned from holiday with one Explora 1 having a corrupt hard drive which required a format. Fortunately the other one had basically all the  same recordings set. I'm sure loadshedding played a role!

 

Octo-LNB to 24-1z/5.2 switches. Explora1 (Prim) & HDPVR 2P (Sec), Samsung 55" UA55F8500 Smart 3D LED TV, HDMI picture & audio via Onkyo TX-NR626
receiver. Explora 2 in bedroom, HDMI picture & audio to Samsung 32" UA32F5500 Smart LED TV. 100Mbps M-Web fibre (OpenServe).
Trending

Re: The Lounge

had load shedding form 9am to 1pm 

00:00 to 4:40 

 

today @ work 10am till 1 pm 

 

@ home 16:00 til 20:30 

 

thats getting a bit much 

~EXPLORA 1~ ~EXPLORA 2a~
BoxOffice

Re: The Lounge

I don't dispute the need to shed load but there are a certain amount of politics and playing games involved here as well.

Apart from the other two times we were off we were scheduled for 22:00 to 00:30 last night which never happened.

 I knew that they downgraded to stage 2 at 23:00 and kept at stage 2 throughout the night 

They switched to stage 4 again at 09:00 

At stage 2 we were scheduled for 06:00 to 08:30 this morning which also never happened. 

If the grid is so tight and load shedding necessary why were we skipped for 5 hours. not that we are not thankful but both times would not have mattered that much in any case

Explora 2A (primary) Explora 3A Secondary SLNB LMX501  Samsung S9   Samsung Tab
Showmaxed

Re: The Lounge


@Citanul wrote:

@Optimist wrote:

and last night they started shedding after midnight!!

 


That was an Eskom thing.  We were on Stage 2 all through the night, and back to Stage 4 this morning.


I considered that possibility (would explain the confused webpage as well), and for either stage we did have the post-midnight listing, which we've always had "included", but as stage 2 is low priority compared it then surely wouldn't have qualified taking such a mad late action.

Unless our municipality were confused by mixed info as well... :-/

 

Either way, all I can say is BAH! for the usual wide lack of basic effort in some organisations these days!

Action

Re: The Lounge


@Optimist wrote:

and last night they started shedding after midnight!!

 


That was an Eskom thing.  We were on Stage 2 all through the night, and back to Stage 4 this morning.

Showmaxed

Re: The Lounge

Chaos continues to reign in Jo'burg with our LS - now duration ranges from 2.5 to over 4 hours, start and end times fluctuate and don't always stick properly to the time slot, and last night they started shedding after midnight!! Are they mad?! Who knows how many alarms went off and alarm clocks didn't!!

 

And today, we've got conflicting info on the same municipal page...

 

LS stage confusion.jpg

.

Highlighted
Trending

Re: The Lounge

Governing body has got a lot to do with it. 

~EXPLORA 1~ ~EXPLORA 2a~
BoxOffice

Re: The Lounge


@Citanul wrote:

@JeanP wrote:

so not only did we have load shedding last night. I was told at power went off at exactly 12pm today MORE LOAD SHEDDINGSmiley Mad 12pm-16:30


Fortunately in Cape Town we only go off for two hours at a time.  Four hours without electricity is ridiculous!


Ja, that's a JHB thing... not sure the reasoning (if any) behind it. Pta is 2.5 , with 30min overlap between the zones

SLNB LMX501| Explora 2A (Primary 4,5,6) Explora 2A (Secondary 0,1,2) | Xtraview - decoders same room | 3 distributed HDMI endpoints via 2x4 Matrix
and Cat6 | 200/100 Fibre (OpenServe/Afrihost Premium UnCapped) | HD 5S in holiday mode
Action

Re: The Lounge


@JeanP wrote:

so not only did we have load shedding last night. I was told at power went off at exactly 12pm today MORE LOAD SHEDDINGSmiley Mad 12pm-16:30


Fortunately in Cape Town we only go off for two hours at a time.  Four hours without electricity is ridiculous!

Red Carpet

Re: The Lounge

Thankfully, we are unaffected ( or supposed to not be affected) today by LS.

Yes, the political parties are really active. I responded to their call to say, I will vote for them IF the DA will see to it that I get a job by the end of the month.

Octo LNB; 2 by 2x4 MS; 2 by ES 5-2; Dedicated PSU for LNB, ES's, MS's; HD PVR 4P x 2; Explora 1; DSD 660; FSM